Committee considered a report regarding 18/00833/FUL, erection of 420
dwellings, associated works including engineering works, new roads,
landscaping and public open space. Diversion of public rights of
way.
Vijay Kaul, Senior Planning Officer, reported the following
updates to the report since it had been published:
- The Coal Authority had no objections to the
application,
- The recommendation within the report should include a long-term
drainage maintenance plan.
Resolved:
That the Strategic Director for Place be given delegated
authority to grant planning application 18/00833/FUL subject
to:
(i)
Completion of Section 111 to obligate the developer to enter into a
Section 106 agreement on taking possession of the land to
secure:
·
£2,500 per unit towards the expansion and
relocation of Loxdale Primary School which is located adjacent to
the Application Site;
·
£2,500 per unit towards the creation,
enhancement and maintenance of open space located adjacent to the
Application Site;
·
The creation of a management company to
maintain:
o
the on-site open space that is not privately
maintained along with a long-term Landscape Management
Plan
o
the underground drainage system (not adopted by
Severn Trent Water) for the life of development and long-term
drainage maintenance plan.
- Provision of 25% Affordable Housing
- £12,000 towards provision of Traffic Regulation
Order
- Legal costs
(iii) Subject to any appropriate conditions including (but not
limited to):
- Commencement
- Phasing plan
- Approved plans
- Materials schedule
- Final finished floor levels to be agreed, with maximum 2.5m
retaining for plots 223, 233 and 234
- Submission of detailed landscaping scheme
- Boundary treatment – across the site and adjacent the
canal
- Drilling and grouting implementation
- Verification report of Remediation and Enabling Works
Strategy
- Mine workings – treatment
- Traffic calming, bus lane signage
- Visibility Splays
- Implement in accordance with Travel Plan
- HGV routing plan
- Hoarding plan SKM04-HP-01 to be implemented
- Ecological mitigation in accordance with submitted
details
- Updated badger survey should be undertaken within 2 months of
the start on site and an amended mitigation strategy provided as
necessary
- Detailed drainage design to include details of SUDS/infiltration
trench drainage
- Tree Protection / removal in accordance with approved
plan
- Noise mitigation (inc acoustic glazing, mechanical ventilation
and 2.5 acoustic fencing)
- Floodlighting / school MUGA – prior to occupation
impacts
- Details of connections to existing PRoW’s
- Construction methodology, materials and measures to prevent
vehicles/motorbikes in pedestrian linkages to canal.
- Details of the new footpath link to the adjacent site along with
access control.
- Temp PRoW to be implemented
- Diversion of PRoW
- Implementation of the Written Scheme of Investigation –
Archaeology
- Implementation of Energy Statement.
- Electric vehicle charging points
- Updated Employment and training plan
- TRO – scheme to be submitted
- Retaining structure design / structural calculations, including
any fill materials to proposed gabion baskets. Management and
maintenance plan where adjacent highway, CRT land, public open
space, and existing neighbours.
- Details of existing (retained) retaining structures adjacent
canal.
- Updated Skills and Employment Plan submission
- Construction Management Plan
- Removal of Permitted Development rights (to protect residential
amenity and impact on canal)
Bin collection point
location