1. That the 10 year Libraries Strategy (Appendix A to the report) be approved, having read and considered the appendices in full, including the feedback received in the twelve week consultation period (Appendix B to the report) and equalities analysis (Appendix C to the report).
2. That it be agreed to review the location of Bilston Library and Gallery at a future Cabinet meeting, pending more detailed feasibility study.